It is important that the plaster is not installed before the pre plaster inspection, although often the builder has delivered the plaster already.

The following should be completed:

↳ All wall straightening is completed
↳ All outstanding frame inspection defects are completed
↳ Plumbing rough ins done
↳ Electrical rough ins done
↳ Ducted heating rough-ins done

Ideally the brickwork should be completed or at least a large amount so we can check the brick veneer wall cavity compliance. If the brickwork is not completed at this time and your builder is conducting a “reverse build